Hidden Creek DR over Bois Darc Creek
GoodCollin County, Texas · 0.1 MI W of FM 1777 · Structure no. 180430MM0205001
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected February 2023
- Type
- Arch - Deck
- Concrete
- Length
- 151 ft
- 3 main spans
- Daily traffic
- 150
- 2011 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Hidden Creek DR over Bois Darc Creek is a concrete arch - deck carrying Hidden Creek DR over Bois Darc Creek in Collin County, Texas. It was built in 2004, so it is 21 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 150 vehicles a day, roughly 1% of them trucks, projected to reach 300 by 2031. The structure is 151 ft (46 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hidden Creek DR over Bois Darc Creek built?
It was built in 2004, making it 21 years old in 2025.
What condition is Hidden Creek DR over Bois Darc Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does Hidden Creek DR over Bois Darc Creek carry?
About 150 vehicles per day (2011 count), of which roughly 1% are trucks.
How long is Hidden Creek DR over Bois Darc Creek?
The structure is 151 ft (46 m) long with a longest span of 51 ft (15.5 m) and a deck 45 ft wide.
Who owns Hidden Creek DR over Bois Darc Creek?
It is owned by the City or Municipal Highway Agency.