US Bridges

Settlement Way over Trib Rowlett Creek

Good

Collin County, Texas · 0.20 MI S of Tonkawa TR · Structure no. 180430LQ0555001

Built
2004
21 years old
Condition
Good
inspected June 2024
Type
Culvert
Concrete
Length
36 ft
4 main spans
Daily traffic
210
2009 count
Owner
City
City or Municipal Highway Agency

About this bridge

Settlement Way over Trib Rowlett Creek is a concrete culvert carrying Settlement Way over Trib Rowlett Creek in Collin County, Texas. It was built in 2004, so it is 21 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 210 vehicles a day, roughly 3% of them trucks, projected to reach 210 by 2042. The structure is 36 ft (11 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSettlement Way
CrossesTrib Rowlett Creek
Location0.20 MI S of Tonkawa TR
RouteCity Street 0
StateTexas
Coordinates33.14287, -96.71908
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadUnknown
Structure length36 ft (11 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic210 (2009)
Projected traffic210 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Settlement Way over Trib Rowlett Creek built?

It was built in 2004, making it 21 years old in 2025.

What condition is Settlement Way over Trib Rowlett Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Settlement Way over Trib Rowlett Creek carry?

About 210 vehicles per day (2009 count), of which roughly 3% are trucks.

How long is Settlement Way over Trib Rowlett Creek?

The structure is 36 ft (11 m) long with a longest span of 8 ft (2.4 m).

Who owns Settlement Way over Trib Rowlett Creek?

It is owned by the City or Municipal Highway Agency.