US Bridges

Parkwood DR over Stewart Creek Tributary

Good

Collin County, Texas · 0.50 MI S of Main ST · Structure no. 180430J00230001

Built
1996
29 years old
Condition
Good
inspected April 2023
Type
Culvert
Concrete
Length
45 ft
4 main spans
Daily traffic
8,550
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Parkwood DR over Stewart Creek Tributary is a concrete culvert carrying Parkwood DR over Stewart Creek Tributary in Collin County, Texas. It was built in 1996, so it is 29 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,550 vehicles a day, projected to reach 7,400 by 2031. The structure is 45 ft (13.7 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesParkwood DR
CrossesStewart Creek Tributary
Location0.50 MI S of Main ST
RouteCity Street 0
StateTexas
Coordinates33.14267, -96.82516
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadUnknown
Structure length45 ft (13.7 m)
Longest span10 ft (3.2 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,550 (2019)
Projected traffic7,400 by 2031
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Parkwood DR over Stewart Creek Tributary built?

It was built in 1996, making it 29 years old in 2025.

What condition is Parkwood DR over Stewart Creek Tributary in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Parkwood DR over Stewart Creek Tributary carry?

About 8,550 vehicles per day (2019 count).

How long is Parkwood DR over Stewart Creek Tributary?

The structure is 45 ft (13.7 m) long with a longest span of 10 ft (3.2 m).

Who owns Parkwood DR over Stewart Creek Tributary?

It is owned by the City or Municipal Highway Agency.