US Bridges

Olympic Crossingeb over Trib East Fork Trinity

Good

Collin County, Texas · 0.50 MI E of CR 206 · Structure no. 180430D01183007

Built
2017
8 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
284 ft
3 main spans
Daily traffic
10
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Olympic Crossingeb over Trib East Fork Trinity is a prestressed concrete stringer/multi-beam or girder carrying Olympic Crossingeb over Trib East Fork Trinity in Collin County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10 vehicles a day, roughly 3% of them trucks, projected to reach 158 by 2042. The structure is 284 ft (86.6 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesOlympic Crossingeb
CrossesTrib East Fork Trinity
Location0.50 MI E of CR 206
RouteCity Street 0
StateTexas
Coordinates33.28364, -96.61095
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length284 ft (86.6 m)
Longest span97 ft (29.6 m)
Deck width35 ft (10.7 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10 (2022)
Projected traffic158 by 2042
Trucks3%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Olympic Crossingeb over Trib East Fork Trinity built?

It was built in 2017, making it 8 years old in 2025.

What condition is Olympic Crossingeb over Trib East Fork Trinity in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Olympic Crossingeb over Trib East Fork Trinity carry?

About 10 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is Olympic Crossingeb over Trib East Fork Trinity?

The structure is 284 ft (86.6 m) long with a longest span of 97 ft (29.6 m) and a deck 35 ft wide.

Who owns Olympic Crossingeb over Trib East Fork Trinity?

It is owned by the City or Municipal Highway Agency.