Stonebridge DR EB over Rowlett Creek Tributary
GoodCollin County, Texas · 0.2 MI E of FM 2478 · Structure no. 180430D01043001
- Built
- 1988
- 37 years old, rebuilt 2020
- Condition
- Good
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 97 ft
- 3 main spans
- Daily traffic
- 3,707
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Stonebridge DR EB over Rowlett Creek Tributary is a concrete stringer/multi-beam or girder carrying Stonebridge DR EB over Rowlett Creek Tributary in Collin County, Texas. It was built in 1988 and reconstructed in 2020, so it is 37 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,707 vehicles a day, roughly 1% of them trucks, projected to reach 1,806 by 2031. The structure is 97 ft (29.6 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stonebridge DR EB over Rowlett Creek Tributary built?
It was built in 1988, making it 37 years old in 2025. It was reconstructed in 2020.
What condition is Stonebridge DR EB over Rowlett Creek Tributary in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does Stonebridge DR EB over Rowlett Creek Tributary carry?
About 3,707 vehicles per day (2019 count), of which roughly 1% are trucks.
How long is Stonebridge DR EB over Rowlett Creek Tributary?
The structure is 97 ft (29.6 m) long with a longest span of 32 ft (9.8 m) and a deck 36 ft wide.
Who owns Stonebridge DR EB over Rowlett Creek Tributary?
It is owned by the City or Municipal Highway Agency.