US Bridges

Headquarters (wb) over Dallas North Tollway

Good

Collin County, Texas · 0.5 MI S of SH 121 · Structure no. 180430C01040018

Built
2003
22 years old
Condition
Good
inspected December 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
177 ft
2 main spans
Daily traffic
10,609
2014 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Headquarters (wb) over Dallas North Tollway is a prestressed concrete stringer/multi-beam or girder carrying Headquarters (wb) over Dallas North Tollway in Collin County, Texas. It was built in 2003, so it is 22 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,609 vehicles a day, roughly 1% of them trucks, projected to reach 4,000 by 2030. The structure is 177 ft (54 m) long and 85 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHeadquarters (wb)
CrossesDallas North Tollway
Location0.5 MI S of SH 121
RouteCity Street 0
StateTexas
Coordinates33.08437, -96.82369
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadHS 20
Structure length177 ft (54 m)
Longest span95 ft (29 m)
Deck width85 ft (25.8 m)
Roadway width53 ft (16.2 m)
Vertical clearance over deck23 ft (7.1 m)

Traffic and service

Average daily traffic10,609 (2014)
Projected traffic4,000 by 2030
Trucks1%
Lanes on structure6
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Headquarters (wb) over Dallas North Tollway built?

It was built in 2003, making it 22 years old in 2025.

What condition is Headquarters (wb) over Dallas North Tollway in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2022.

How much traffic does Headquarters (wb) over Dallas North Tollway carry?

About 10,609 vehicles per day (2014 count), of which roughly 1% are trucks.

How long is Headquarters (wb) over Dallas North Tollway?

The structure is 177 ft (54 m) long with a longest span of 95 ft (29 m) and a deck 85 ft wide.

Who owns Headquarters (wb) over Dallas North Tollway?

It is owned by the Local Toll Authority.