Dn Tollway NB over Pga Parkway
FairCollin County, Texas · 1.0 MI S of US 380 · Structure no. 1804309D0470056
- Built
- 2007
- 18 years old, rebuilt 2023
- Condition
- Fair
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 309 ft
- 1 main span
- Daily traffic
- 85,136
- 2022 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
Dn Tollway NB over Pga Parkway is a prestressed concrete stringer/multi-beam or girder carrying Dn Tollway NB over Pga Parkway in Collin County, Texas. It was built in 2007 and reconstructed in 2023, so it is 18 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 85,136 vehicles a day, roughly 6% of them trucks, projected to reach 119,190 by 2042. The structure is 309 ft (94.2 m) long and 78 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Dn Tollway NB over Pga Parkway built?
It was built in 2007, making it 18 years old in 2025. It was reconstructed in 2023.
What condition is Dn Tollway NB over Pga Parkway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Dn Tollway NB over Pga Parkway carry?
About 85,136 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is Dn Tollway NB over Pga Parkway?
The structure is 309 ft (94.2 m) long with a longest span of 129 ft (39.3 m) and a deck 78 ft wide.
Who owns Dn Tollway NB over Pga Parkway?
It is owned by the Local Toll Authority.