US Bridges

Dallas N Tollway over Haverwood LN

Good

Collin County, Texas · 0.65 MI N of Frankford RD · Structure no. 1804309D0470004

Built
1991
34 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
173 ft
1 main span
Daily traffic
30,000
2011 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Dallas N Tollway over Haverwood LN is a prestressed concrete stringer/multi-beam or girder carrying Dallas N Tollway over Haverwood LN in Collin County, Texas. It was built in 1991, so it is 34 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30,000 vehicles a day, roughly 10% of them trucks, projected to reach 35,000 by 2031. The structure is 173 ft (52.7 m) long and 122 ft wide.

CarriesDallas N Tollway
CrossesHaverwood LN
Location0.65 MI N of Frankford RD
StateTexas
Coordinates33.0073, -96.82917
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 20
Structure length173 ft (52.7 m)
Longest span70 ft (21.3 m)
Deck width122 ft (37.2 m)
Roadway width117 ft (35.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30,000 (2011)
Projected traffic35,000 by 2031
Trucks10%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Dallas N Tollway over Haverwood LN built?

It was built in 1991, making it 34 years old in 2025.

What condition is Dallas N Tollway over Haverwood LN in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Dallas N Tollway over Haverwood LN carry?

About 30,000 vehicles per day (2011 count), of which roughly 10% are trucks.

How long is Dallas N Tollway over Haverwood LN?

The structure is 173 ft (52.7 m) long with a longest span of 70 ft (21.3 m) and a deck 122 ft wide.

Who owns Dallas N Tollway over Haverwood LN?

It is owned by the Local Toll Authority.