US Bridges

Dallas N Tollway over White Rock Creek Trib

Good

Collin County, Texas · 0.20 MI S of Frankford RD · Structure no. 1804309D0470003

Built
1987
38 years old
Condition
Good
inspected May 2023
Type
Culvert
Concrete
Length
61 ft
4 main spans
Daily traffic
25,900
2011 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Dallas N Tollway over White Rock Creek Trib is a concrete culvert carrying Dallas N Tollway over White Rock Creek Trib in Collin County, Texas. It was built in 1987, so it is 38 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25,900 vehicles a day, projected to reach 31,800 by 2031. The structure is 61 ft (18.6 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesDallas N Tollway
CrossesWhite Rock Creek Trib
Location0.20 MI S of Frankford RD
StateTexas
Coordinates32.99421, -96.82899
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHS 20
Structure length61 ft (18.6 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25,900 (2011)
Projected traffic31,800 by 2031
Trucks0%
Lanes on structure16
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Dallas N Tollway over White Rock Creek Trib built?

It was built in 1987, making it 38 years old in 2025.

What condition is Dallas N Tollway over White Rock Creek Trib in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Dallas N Tollway over White Rock Creek Trib carry?

About 25,900 vehicles per day (2011 count).

How long is Dallas N Tollway over White Rock Creek Trib?

The structure is 61 ft (18.6 m) long with a longest span of 10 ft (3 m).

Who owns Dallas N Tollway over White Rock Creek Trib?

It is owned by the Local Toll Authority.