Pgbt WB over Jupiter RD
GoodCollin County, Texas · 1.5 MI E of US 75 · Structure no. 180430296405555
- Built
- 1999
- 26 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 274 ft
- 3 main spans
- Daily traffic
- 87,129
- 2018 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
Pgbt WB over Jupiter RD is a prestressed concrete stringer/multi-beam or girder carrying Pgbt WB over Jupiter RD in Collin County, Texas. It was built in 1999, so it is 26 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 87,129 vehicles a day, roughly 4% of them trucks, projected to reach 96,111 by 2038. The structure is 274 ft (83.5 m) long and 82 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pgbt WB over Jupiter RD built?
It was built in 1999, making it 26 years old in 2025.
What condition is Pgbt WB over Jupiter RD in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does Pgbt WB over Jupiter RD carry?
About 87,129 vehicles per day (2018 count), of which roughly 4% are trucks.
How long is Pgbt WB over Jupiter RD?
The structure is 274 ft (83.5 m) long with a longest span of 106 ft (32.3 m) and a deck 82 ft wide.
Who owns Pgbt WB over Jupiter RD?
It is owned by the Local Toll Authority.