US Bridges

SH 190 WB over Custer Pkwy

Good

Collin County, Texas · SH 190 @ Custer Pkwy. · Structure no. 180430296405553

Built
1999
26 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
337 ft
1 main span
Daily traffic
59,366
2018 count
Owner
Toll Authority
Local Toll Authority

About this bridge

SH 190 WB over Custer Pkwy is a prestressed concrete continuous stringer/multi-beam or girder carrying SH 190 WB over Custer Pkwy in Collin County, Texas. It was built in 1999, so it is 26 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 59,366 vehicles a day, roughly 5% of them trucks, projected to reach 83,113 by 2038. The structure is 337 ft (102.7 m) long and 78 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSH 190 WB
CrossesCuster Pkwy
LocationSH 190 @ Custer Pkwy.
StateTexas
Coordinates33.00399, -96.73221
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 20
Structure length337 ft (102.7 m)
Longest span137 ft (41.8 m)
Deck width78 ft (23.8 m)
Roadway width75 ft (23 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic59,366 (2018)
Projected traffic83,113 by 2038
Trucks5%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH 190 WB over Custer Pkwy built?

It was built in 1999, making it 26 years old in 2025.

What condition is SH 190 WB over Custer Pkwy in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does SH 190 WB over Custer Pkwy carry?

About 59,366 vehicles per day (2018 count), of which roughly 5% are trucks.

How long is SH 190 WB over Custer Pkwy?

The structure is 337 ft (102.7 m) long with a longest span of 137 ft (41.8 m) and a deck 78 ft wide.

Who owns SH 190 WB over Custer Pkwy?

It is owned by the Local Toll Authority.