US 75 SB on Rp U over Renner Road & Spring Ck
GoodCollin County, Texas · US 75 @ SH 190 · Structure no. 180430296405326
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,119 ft
- 3 main spans
- Daily traffic
- 123,424
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US 75 SB on Rp U over Renner Road & Spring Ck is a prestressed concrete stringer/multi-beam or girder carrying US 75 SB on Rp U over Renner Road & Spring Ck in Collin County, Texas. It was built in 1998, so it is 27 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 123,424 vehicles a day, roughly 1% of them trucks, projected to reach 38,647 by 2040. The structure is 1,119 ft (341.1 m) long and 21 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 75 SB on Rp U over Renner Road & Spring Ck built?
It was built in 1998, making it 27 years old in 2025.
What condition is US 75 SB on Rp U over Renner Road & Spring Ck in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does US 75 SB on Rp U over Renner Road & Spring Ck carry?
About 123,424 vehicles per day (2023 count), of which roughly 1% are trucks.
How long is US 75 SB on Rp U over Renner Road & Spring Ck?
The structure is 1,119 ft (341.1 m) long with a longest span of 127 ft (38.7 m) and a deck 21 ft wide.
Who owns US 75 SB on Rp U over Renner Road & Spring Ck?
It is owned by the State Highway Agency.