FM 455 over Little Elm Creek Relief
GoodCollin County, Texas · 5.50 MI W of SH 289 · Structure no. 180430081604061
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 75 ft
- 1 main span
- Daily traffic
- 2,627
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
FM 455 over Little Elm Creek Relief is a prestressed concrete stringer/multi-beam or girder carrying FM 455 over Little Elm Creek Relief in Collin County, Texas. It was built in 2008, so it is 17 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,627 vehicles a day, roughly 4% of them trucks, projected to reach 3,517 by 2038. The structure is 75 ft (22.9 m) long and 46 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 455 over Little Elm Creek Relief built?
It was built in 2008, making it 17 years old in 2025.
What condition is FM 455 over Little Elm Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does FM 455 over Little Elm Creek Relief carry?
About 2,627 vehicles per day (2022 count), of which roughly 4% are trucks.
How long is FM 455 over Little Elm Creek Relief?
The structure is 75 ft (22.9 m) long with a longest span of 75 ft (22.9 m) and a deck 46 ft wide.
Who owns FM 455 over Little Elm Creek Relief?
It is owned by the State Highway Agency.