US Bridges

Srt SB over White Rock Creek

Good

Collin County, Texas · 1.4 MI NE of SH 289 · Structure no. 180430036404429

Built
2009
16 years old, rebuilt 2020
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
670 ft
5 main spans
Daily traffic
110,632
2020 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Srt SB over White Rock Creek is a prestressed concrete stringer/multi-beam or girder carrying Srt SB over White Rock Creek in Collin County, Texas. It was built in 2009 and reconstructed in 2020, so it is 16 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 110,632 vehicles a day, roughly 5% of them trucks, projected to reach 154,885 by 2040. The structure is 670 ft (204.2 m) long and 86 ft wide.

CarriesSrt SB
CrossesWhite Rock Creek
Location1.4 MI NE of SH 289
StateTexas
Coordinates33.10599, -96.78408
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5 (+1 approach)
Design loadHS 20
Structure length670 ft (204.2 m)
Longest span130 ft (39.6 m)
Deck width86 ft (26.2 m)
Roadway width82 ft (24.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic110,632 (2020)
Projected traffic154,885 by 2040
Trucks5%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Srt SB over White Rock Creek built?

It was built in 2009, making it 16 years old in 2025. It was reconstructed in 2020.

What condition is Srt SB over White Rock Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Srt SB over White Rock Creek carry?

About 110,632 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is Srt SB over White Rock Creek?

The structure is 670 ft (204.2 m) long with a longest span of 130 ft (39.6 m) and a deck 86 ft wide.

Who owns Srt SB over White Rock Creek?

It is owned by the Local Toll Authority.