SH 78 over Draw
GoodCollin County, Texas · At Int US 380 & SH 78 · Structure no. 180430013504235
- Built
- 2012
- 13 years old
- Condition
- Good
- inspected May 2023
- Type
- Culvert
- Concrete
- Length
- 28 ft
- 3 main spans
- Daily traffic
- 22,010
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SH 78 over Draw is a concrete culvert carrying SH 78 over Draw in Collin County, Texas. It was built in 2012, so it is 13 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 22,010 vehicles a day, roughly 14% of them trucks, projected to reach 6,420 by 2037. The structure is 28 ft (8.5 m) long. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 78 over Draw built?
It was built in 2012, making it 13 years old in 2025.
What condition is SH 78 over Draw in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does SH 78 over Draw carry?
About 22,010 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is SH 78 over Draw?
The structure is 28 ft (8.5 m) long with a longest span of 8 ft (2.4 m).
Who owns SH 78 over Draw?
It is owned by the State Highway Agency.