US Bridges

W Foster Crossing over US 75

Good

Collin County, Texas · 3.8 MI N of SH 121 · Structure no. 180430004714666

Built
2019
6 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
355 ft
2 main spans
Daily traffic
1,561
2015 count
Owner
State
State Highway Agency

About this bridge

W Foster Crossing over US 75 is a prestressed concrete stringer/multi-beam or girder carrying W Foster Crossing over US 75 in Collin County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,561 vehicles a day, roughly 3% of them trucks, projected to reach 2,185 by 2037. The structure is 355 ft (108.2 m) long and 110 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesW Foster Crossing
CrossesUS 75
Location3.8 MI N of SH 121
RouteCity Street 0
StateTexas
Coordinates33.31898, -96.59107
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2 (+2 approach)
Design loadHL 93
Structure length355 ft (108.2 m)
Longest span120 ft (36.6 m)
Deck width110 ft (33.5 m)
Roadway width93 ft (28.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,561 (2015)
Projected traffic2,185 by 2037
Trucks3%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was W Foster Crossing over US 75 built?

It was built in 2019, making it 6 years old in 2025.

What condition is W Foster Crossing over US 75 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does W Foster Crossing over US 75 carry?

About 1,561 vehicles per day (2015 count), of which roughly 3% are trucks.

How long is W Foster Crossing over US 75?

The structure is 355 ft (108.2 m) long with a longest span of 120 ft (36.6 m) and a deck 110 ft wide.

Who owns W Foster Crossing over US 75?

It is owned by the State Highway Agency.