US Bridges

US 75 NB over Spur 359/FM 3038

Good

Collin County, Texas · 1.30 MI S of US 380 · Structure no. 180430004714640

Built
2015
10 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
362 ft
3 main spans
Daily traffic
47,521
2020 count
Owner
State
State Highway Agency

About this bridge

US 75 NB over Spur 359/FM 3038 is a prestressed concrete stringer/multi-beam or girder carrying US 75 NB over Spur 359/FM 3038 in Collin County, Texas. It was built in 2015, so it is 10 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 47,521 vehicles a day, roughly 10% of them trucks, projected to reach 95,042 by 2040. The structure is 362 ft (110.3 m) long and 98 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 75 NB
CrossesSpur 359/FM 3038
Location1.30 MI S of US 380
RouteU.S. Route 75
StateTexas
Coordinates33.19842, -96.63874
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length362 ft (110.3 m)
Longest span124 ft (37.8 m)
Deck width98 ft (29.9 m)
Roadway width80 ft (24.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic47,521 (2020)
Projected traffic95,042 by 2040
Trucks10%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 75 NB over Spur 359/FM 3038 built?

It was built in 2015, making it 10 years old in 2025.

What condition is US 75 NB over Spur 359/FM 3038 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does US 75 NB over Spur 359/FM 3038 carry?

About 47,521 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is US 75 NB over Spur 359/FM 3038?

The structure is 362 ft (110.3 m) long with a longest span of 124 ft (37.8 m) and a deck 98 ft wide.

Who owns US 75 NB over Spur 359/FM 3038?

It is owned by the State Highway Agency.