US Bridges

US 75 NB over FM 2786/STACY RD

Fair

Collin County, Texas · 2.2 MI N of FM 2170 · Structure no. 180430004706410

Built
1999
26 years old, rebuilt 2015
Condition
Fair
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
363 ft
3 main spans
Daily traffic
84,751
2023 count
Owner
State
State Highway Agency

About this bridge

US 75 NB over FM 2786/STACY RD is a prestressed concrete stringer/multi-beam or girder carrying US 75 NB over FM 2786/STACY RD in Collin County, Texas. It was built in 1999 and reconstructed in 2015, so it is 26 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 84,751 vehicles a day, roughly 7% of them trucks, projected to reach 178,297 by 2038. The structure is 363 ft (110.6 m) long and 79 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 75 NB
CrossesFM 2786/STACY RD
Location2.2 MI N of FM 2170
RouteU.S. Route 75
StateTexas
Coordinates33.12993, -96.65958
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length363 ft (110.6 m)
Longest span128 ft (39 m)
Deck width79 ft (24.1 m)
Roadway width76 ft (23.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic84,751 (2023)
Projected traffic178,297 by 2038
Trucks7%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 75 NB over FM 2786/STACY RD built?

It was built in 1999, making it 26 years old in 2025. It was reconstructed in 2015.

What condition is US 75 NB over FM 2786/STACY RD in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does US 75 NB over FM 2786/STACY RD carry?

About 84,751 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is US 75 NB over FM 2786/STACY RD?

The structure is 363 ft (110.6 m) long with a longest span of 128 ft (39 m) and a deck 79 ft wide.

Who owns US 75 NB over FM 2786/STACY RD?

It is owned by the State Highway Agency.