US Bridges

Mallard RD over Berry Creek

Good

Burleson County, Texas · 2.55 MI W of FM 3058 · Structure no. 170260AA0744101

Built
2024
1 years old
Condition
Good
inspected October 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
80 ft
1 main span
Daily traffic
180
2020 count
Owner
County
County Highway Agency

About this bridge

Mallard RD over Berry Creek is a prestressed concrete box beam or girders - multiple carrying Mallard RD over Berry Creek in Burleson County, Texas. It was built in 2024, so it is 1 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 180 vehicles a day, roughly 1% of them trucks, projected to reach 180 by 2040. The structure is 80 ft (24.4 m) long and 26 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesMallard RD
CrossesBerry Creek
Location2.55 MI W of FM 3058
RouteCounty Highway 0
StateTexas
Coordinates30.44101, -96.55961
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+1 approach)
Design loadHL 93
Structure length80 ft (24.4 m)
Longest span50 ft (15.2 m)
Deck width26 ft (8 m)
Roadway width23 ft (7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic180 (2020)
Projected traffic180 by 2040
Trucks1%
Lanes on structure2
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Mallard RD over Berry Creek built?

It was built in 2024, making it 1 years old in 2025.

What condition is Mallard RD over Berry Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Mallard RD over Berry Creek carry?

About 180 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Mallard RD over Berry Creek?

The structure is 80 ft (24.4 m) long with a longest span of 50 ft (15.2 m) and a deck 26 ft wide.

Who owns Mallard RD over Berry Creek?

It is owned by the County Highway Agency.