FM 60 over Davidson Creek Relief
FairBurleson County, Texas · 2.6 MI NE of SH 36 · Structure no. 170260064803012
- Built
- 1951
- 74 years old, rebuilt 1970
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 150 ft
- 5 main spans
- Daily traffic
- 100
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
FM 60 over Davidson Creek Relief is a concrete stringer/multi-beam or girder carrying FM 60 over Davidson Creek Relief in Burleson County, Texas. It was built in 1951 and reconstructed in 1970, so it is 74 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, roughly 1% of them trucks, projected to reach 250 by 2042. The structure is 150 ft (45.7 m) long and 51 ft wide. If it were closed, the detour would be 16.8 mi (27 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 60 over Davidson Creek Relief built?
It was built in 1951, making it 74 years old in 2025. It was reconstructed in 1970.
What condition is FM 60 over Davidson Creek Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does FM 60 over Davidson Creek Relief carry?
About 100 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is FM 60 over Davidson Creek Relief?
The structure is 150 ft (45.7 m) long with a longest span of 30 ft (9.1 m) and a deck 51 ft wide.
Who owns FM 60 over Davidson Creek Relief?
It is owned by the State Highway Agency.