FM 60 EB over Davidson Creek Relief
GoodBurleson County, Texas · 2.54 MI NE of SH 36 · Structure no. 170260064803026
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 600 ft
- 6 main spans
- Daily traffic
- 3,072
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FM 60 EB over Davidson Creek Relief is a prestressed concrete stringer/multi-beam or girder carrying FM 60 EB over Davidson Creek Relief in Burleson County, Texas. It was built in 2024, so it is 1 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,072 vehicles a day, roughly 9% of them trucks, projected to reach 6,021 by 2042. The structure is 600 ft (182.9 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 60 EB over Davidson Creek Relief built?
It was built in 2024, making it 1 years old in 2025.
What condition is FM 60 EB over Davidson Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does FM 60 EB over Davidson Creek Relief carry?
About 3,072 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is FM 60 EB over Davidson Creek Relief?
The structure is 600 ft (182.9 m) long with a longest span of 100 ft (30.5 m) and a deck 40 ft wide.
Who owns FM 60 EB over Davidson Creek Relief?
It is owned by the State Highway Agency.