US Bridges

IH 30 WB Frtg RD over Waggoner Creek

Good

Bowie County, Texas · 0.50 MI E of FM 2878 · Structure no. 190190061007193

Built
2004
21 years old, rebuilt 2010
Condition
Good
inspected August 2024
Type
Culvert
Concrete
Length
73 ft
6 main spans
Daily traffic
10,104
2023 count
Owner
State
State Highway Agency

About this bridge

IH 30 WB Frtg RD over Waggoner Creek is a concrete culvert carrying IH 30 WB Frtg RD over Waggoner Creek in Bowie County, Texas. It was built in 2004 and reconstructed in 2010, so it is 21 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,104 vehicles a day, roughly 11% of them trucks, projected to reach 11,850 by 2033. The structure is 73 ft (22.3 m) long.

CarriesIH 30 WB Frtg RD
CrossesWaggoner Creek
Location0.50 MI E of FM 2878
RouteInterstate 30
StateTexas
Coordinates33.45255, -94.11364
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans6
Design loadHS 20
Structure length73 ft (22.3 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,104 (2023)
Projected traffic11,850 by 2033
Trucks11%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IH 30 WB Frtg RD over Waggoner Creek built?

It was built in 2004, making it 21 years old in 2025. It was reconstructed in 2010.

What condition is IH 30 WB Frtg RD over Waggoner Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does IH 30 WB Frtg RD over Waggoner Creek carry?

About 10,104 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is IH 30 WB Frtg RD over Waggoner Creek?

The structure is 73 ft (22.3 m) long with a longest span of 12 ft (3.7 m).

Who owns IH 30 WB Frtg RD over Waggoner Creek?

It is owned by the State Highway Agency.