US Bridges

IH 30 & Ebfr over Waggoner Creek Relief

Fair

Bowie County, Texas · 0.70 MI W of US 59 · Structure no. 190190061007067

Built
1964
61 years old, rebuilt 2008
Condition
Fair
inspected August 2024
Type
Culvert
Concrete
Length
25 ft
3 main spans
Daily traffic
16,890
2023 count
Owner
State
State Highway Agency

About this bridge

IH 30 & Ebfr over Waggoner Creek Relief is a concrete culvert carrying IH 30 & Ebfr over Waggoner Creek Relief in Bowie County, Texas. It was built in 1964 and reconstructed in 2008, so it is 61 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 16,890 vehicles a day, roughly 48% of them trucks, projected to reach 43,540 by 2033. The structure is 25 ft (7.6 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIH 30 & Ebfr
CrossesWaggoner Creek Relief
Location0.70 MI W of US 59
RouteInterstate 30
StateTexas
Coordinates33.45161, -94.1095
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length25 ft (7.6 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,890 (2023)
Projected traffic43,540 by 2033
Trucks48%
Lanes on structure9
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IH 30 & Ebfr over Waggoner Creek Relief built?

It was built in 1964, making it 61 years old in 2025. It was reconstructed in 2008.

What condition is IH 30 & Ebfr over Waggoner Creek Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does IH 30 & Ebfr over Waggoner Creek Relief carry?

About 16,890 vehicles per day (2023 count), of which roughly 48% are trucks.

How long is IH 30 & Ebfr over Waggoner Creek Relief?

The structure is 25 ft (7.6 m) long with a longest span of 8 ft (2.4 m).

Who owns IH 30 & Ebfr over Waggoner Creek Relief?

It is owned by the State Highway Agency.