US Bridges

Marne RD over Drainage

Fair

Bexar County, Texas · 1.0 Mile North of Camp Bu · Structure no. AFTXCRYB00021

Built
2011
14 years old
Condition
Fair
inspected February 2024
Type
Culvert
Concrete
Length
71 ft
6 main spans
Daily traffic
150
2016 count
Owner
Federal
Air Force

About this bridge

Marne RD over Drainage is a concrete culvert carrying Marne RD over Drainage in Bexar County, Texas. It was built in 2011, so it is 14 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 150 vehicles a day, projected to reach 180 by 2036. The structure is 71 ft (21.7 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesMarne RD
CrossesDrainage
Location1.0 Mile North of Camp Bu
RouteFederal Lands Road 0
StateTexas
Coordinates29.65197, -98.58619
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71 US tons
Inventory rating43 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans6
Design loadHL 93
Structure length71 ft (21.7 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150 (2016)
Projected traffic180 by 2036
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerAir Force
Maintained byAir Force
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$30,000 (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Marne RD over Drainage built?

It was built in 2011, making it 14 years old in 2025.

What condition is Marne RD over Drainage in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does Marne RD over Drainage carry?

About 150 vehicles per day (2016 count).

How long is Marne RD over Drainage?

The structure is 71 ft (21.7 m) long with a longest span of 10 ft (3 m).

Who owns Marne RD over Drainage?

It is owned by the Air Force.