US Bridges

Dominion DR over Leon Creek Relief

Fair

Bexar County, Texas · 0.02 MI E of IH 10 WB FR · Structure no. 150150007208392

Built
2009
16 years old
Condition
Fair
inspected December 2024
Type
Culvert
Concrete
Length
37 ft
3 main spans
Daily traffic
4,674
2020 count
Owner
State
State Highway Agency

About this bridge

Dominion DR over Leon Creek Relief is a concrete culvert carrying Dominion DR over Leon Creek Relief in Bexar County, Texas. It was built in 2009, so it is 16 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,674 vehicles a day, roughly 3% of them trucks, projected to reach 309 by 2042. The structure is 37 ft (11.3 m) long. If it were closed, the detour would be 98.8 mi (159 km).

CarriesDominion DR
CrossesLeon Creek Relief
Location0.02 MI E of IH 10 WB FR
StateTexas
Coordinates29.64916, -98.62163
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length37 ft (11.3 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,674 (2020)
Projected traffic309 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Dominion DR over Leon Creek Relief built?

It was built in 2009, making it 16 years old in 2025.

What condition is Dominion DR over Leon Creek Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does Dominion DR over Leon Creek Relief carry?

About 4,674 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is Dominion DR over Leon Creek Relief?

The structure is 37 ft (11.3 m) long with a longest span of 10 ft (3 m).

Who owns Dominion DR over Leon Creek Relief?

It is owned by the State Highway Agency.