W Green Mountain over Draw
FairBexar County, Texas · 0.55 MI SW of E Evans RD · Structure no. 150150B14735002
- Built
- 1996
- 29 years old
- Condition
- Fair
- inspected July 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 126 ft
- 3 main spans
- Daily traffic
- 9,221
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
W Green Mountain over Draw is a prestressed concrete box beam or girders - multiple carrying W Green Mountain over Draw in Bexar County, Texas. It was built in 1996, so it is 29 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,221 vehicles a day, projected to reach 800 by 2031. The structure is 126 ft (38.4 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W Green Mountain over Draw built?
It was built in 1996, making it 29 years old in 2025.
What condition is W Green Mountain over Draw in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does W Green Mountain over Draw carry?
About 9,221 vehicles per day (2020 count).
How long is W Green Mountain over Draw?
The structure is 126 ft (38.4 m) long with a longest span of 41 ft (12.5 m) and a deck 46 ft wide.
Who owns W Green Mountain over Draw?
It is owned by the City or Municipal Highway Agency.