US Bridges

E Evans RD over Alamo Cement CO Haul RD

Fair

Bexar County, Texas · 4.35 MI E of Bulverde RD · Structure no. 150150B11479001

Built
2002
23 years old
Condition
Fair
inspected July 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
103 ft
2 main spans
Daily traffic
7,151
2015 count
Owner
City
City or Municipal Highway Agency

About this bridge

E Evans RD over Alamo Cement CO Haul RD is a prestressed concrete box beam or girders - multiple carrying E Evans RD over Alamo Cement CO Haul RD in Bexar County, Texas. It was built in 2002, so it is 23 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,151 vehicles a day, projected to reach 1,200 by 2031. The structure is 103 ft (31.4 m) long and 47 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesE Evans RD
CrossesAlamo Cement CO Haul RD
Location4.35 MI E of Bulverde RD
RouteCity Street 0
StateTexas
Coordinates29.62345, -98.36649
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length103 ft (31.4 m)
Longest span50 ft (15.2 m)
Deck width47 ft (14.2 m)
Roadway width44 ft (13.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,151 (2015)
Projected traffic1,200 by 2031
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was E Evans RD over Alamo Cement CO Haul RD built?

It was built in 2002, making it 23 years old in 2025.

What condition is E Evans RD over Alamo Cement CO Haul RD in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does E Evans RD over Alamo Cement CO Haul RD carry?

About 7,151 vehicles per day (2015 count).

How long is E Evans RD over Alamo Cement CO Haul RD?

The structure is 103 ft (31.4 m) long with a longest span of 50 ft (15.2 m) and a deck 47 ft wide.

Who owns E Evans RD over Alamo Cement CO Haul RD?

It is owned by the City or Municipal Highway Agency.