US Bridges

Eugenia Pass over Leon Creek

Good

Bexar County, Texas · .01 MI N of Boerne Stage · Structure no. 150150B11447001

Built
2015
10 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
350 ft
5 main spans
Daily traffic
2,241
2020 count
Owner
County
County Highway Agency

About this bridge

Eugenia Pass over Leon Creek is a prestressed concrete stringer/multi-beam or girder carrying Eugenia Pass over Leon Creek in Bexar County, Texas. It was built in 2015, so it is 10 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,241 vehicles a day, roughly 1% of them trucks, projected to reach 1,000 by 2036. The structure is 350 ft (106.7 m) long and 47 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEugenia Pass
CrossesLeon Creek
Location.01 MI N of Boerne Stage
RouteCity Street 0
StateTexas
Coordinates29.66755, -98.63436
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans5
Design loadHL 93
Structure length350 ft (106.7 m)
Longest span76 ft (23.2 m)
Deck width47 ft (14.3 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,241 (2020)
Projected traffic1,000 by 2036
Trucks1%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Eugenia Pass over Leon Creek built?

It was built in 2015, making it 10 years old in 2025.

What condition is Eugenia Pass over Leon Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Eugenia Pass over Leon Creek carry?

About 2,241 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Eugenia Pass over Leon Creek?

The structure is 350 ft (106.7 m) long with a longest span of 76 ft (23.2 m) and a deck 47 ft wide.

Who owns Eugenia Pass over Leon Creek?

It is owned by the County Highway Agency.