US Bridges

IH 10 East FR (wb) over Leon Creek

Good

Bexar County, Texas · 0.6 MI S of FM 3351 · Structure no. 150150007207403

Built
2016
9 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
140 ft
1 main span
Daily traffic
9,146
2023 count
Owner
State
State Highway Agency

About this bridge

IH 10 East FR (wb) over Leon Creek is a prestressed concrete stringer/multi-beam or girder carrying IH 10 East FR (wb) over Leon Creek in Bexar County, Texas. It was built in 2016, so it is 9 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,146 vehicles a day, roughly 3% of them trucks, projected to reach 12,804 by 2042. The structure is 140 ft (42.7 m) long and 49 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIH 10 East FR (wb)
CrossesLeon Creek
Location0.6 MI S of FM 3351
RouteInterstate 10
StateTexas
Coordinates29.6673, -98.63033
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHL 93
Structure length140 ft (42.7 m)
Longest span60 ft (18.3 m)
Deck width49 ft (14.8 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,146 (2023)
Projected traffic12,804 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IH 10 East FR (wb) over Leon Creek built?

It was built in 2016, making it 9 years old in 2025.

What condition is IH 10 East FR (wb) over Leon Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does IH 10 East FR (wb) over Leon Creek carry?

About 9,146 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is IH 10 East FR (wb) over Leon Creek?

The structure is 140 ft (42.7 m) long with a longest span of 60 ft (18.3 m) and a deck 49 ft wide.

Who owns IH 10 East FR (wb) over Leon Creek?

It is owned by the State Highway Agency.