US Bridges

Barrington ST over Draw

Good

Bexar County, Texas · 0.3 MI E of Starcrest · Structure no. 150150B02280002

Built
2015
10 years old
Condition
Good
inspected July 2023
Type
Other
Prestressed Concrete
Length
75 ft
2 main spans
Daily traffic
3,464
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Barrington ST over Draw is a prestressed concrete other carrying Barrington ST over Draw in Bexar County, Texas. It was built in 2015, so it is 10 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,464 vehicles a day, roughly 1% of them trucks, projected to reach 4,075 by 2031. The structure is 75 ft (22.9 m) long and 46 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesBarrington ST
CrossesDraw
Location0.3 MI E of Starcrest
RouteCity Street 0
StateTexas
Coordinates29.52289, -98.41792
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeOther
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length75 ft (22.9 m)
Longest span37 ft (11.4 m)
Deck width46 ft (13.9 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,464 (2020)
Projected traffic4,075 by 2031
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Barrington ST over Draw built?

It was built in 2015, making it 10 years old in 2025.

What condition is Barrington ST over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Barrington ST over Draw carry?

About 3,464 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Barrington ST over Draw?

The structure is 75 ft (22.9 m) long with a longest span of 37 ft (11.4 m) and a deck 46 ft wide.

Who owns Barrington ST over Draw?

It is owned by the City or Municipal Highway Agency.