Barrington ST over Draw
GoodBexar County, Texas · 0.3 MI E of Starcrest · Structure no. 150150B02280002
- Built
- 2015
- 10 years old
- Condition
- Good
- inspected July 2023
- Type
- Other
- Prestressed Concrete
- Length
- 75 ft
- 2 main spans
- Daily traffic
- 3,464
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Barrington ST over Draw is a prestressed concrete other carrying Barrington ST over Draw in Bexar County, Texas. It was built in 2015, so it is 10 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,464 vehicles a day, roughly 1% of them trucks, projected to reach 4,075 by 2031. The structure is 75 ft (22.9 m) long and 46 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Barrington ST over Draw built?
It was built in 2015, making it 10 years old in 2025.
What condition is Barrington ST over Draw in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Barrington ST over Draw carry?
About 3,464 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is Barrington ST over Draw?
The structure is 75 ft (22.9 m) long with a longest span of 37 ft (11.4 m) and a deck 46 ft wide.
Who owns Barrington ST over Draw?
It is owned by the City or Municipal Highway Agency.