US Bridges

IH 410 Ebfr over Quail Creek

Fair

Bexar County, Texas · 3.75 MI E of US 281 · Structure no. 150150052104297

Built
2008
17 years old
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
100 ft
1 main span
Daily traffic
10,510
2018 count
Owner
State
State Highway Agency

About this bridge

IH 410 Ebfr over Quail Creek is a prestressed concrete stringer/multi-beam or girder carrying IH 410 Ebfr over Quail Creek in Bexar County, Texas. It was built in 2008, so it is 17 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10,510 vehicles a day, roughly 5% of them trucks, projected to reach 11,561 by 2038. The structure is 100 ft (30.5 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIH 410 Ebfr
CrossesQuail Creek
Location3.75 MI E of US 281
RouteState Highway 410
StateTexas
Coordinates29.51568, -98.41753
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1 (+2 approach)
Design loadHS 20
Structure length100 ft (30.5 m)
Longest span40 ft (12.2 m)
Deck width48 ft (14.6 m)
Roadway width39 ft (11.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,510 (2018)
Projected traffic11,561 by 2038
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IH 410 Ebfr over Quail Creek built?

It was built in 2008, making it 17 years old in 2025.

What condition is IH 410 Ebfr over Quail Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does IH 410 Ebfr over Quail Creek carry?

About 10,510 vehicles per day (2018 count), of which roughly 5% are trucks.

How long is IH 410 Ebfr over Quail Creek?

The structure is 100 ft (30.5 m) long with a longest span of 40 ft (12.2 m) and a deck 48 ft wide.

Who owns IH 410 Ebfr over Quail Creek?

It is owned by the State Highway Agency.