US Bridges

Starcrest DR NB over IH 410 Ml & EB Off Ramp

Good

Bexar County, Texas · 3.4 MI E of US 281 · Structure no. 150150052104326

Built
2010
15 years old
Condition
Good
inspected July 2022
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
218 ft
2 main spans
Daily traffic
1,250
2014 count
Owner
State
State Highway Agency

About this bridge

Starcrest DR NB over IH 410 Ml & EB Off Ramp is a prestressed concrete box beam or girders - multiple carrying Starcrest DR NB over IH 410 Ml & EB Off Ramp in Bexar County, Texas. It was built in 2010, so it is 15 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,250 vehicles a day, projected to reach 2,000 by 2034. The structure is 218 ft (66.4 m) long and 94 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesStarcrest DR NB
CrossesIH 410 Ml & EB Off Ramp
Location3.4 MI E of US 281
RouteCity Street 0
StateTexas
Coordinates29.51566, -98.42257
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2 (+1 approach)
Design loadHS 20
Structure length218 ft (66.4 m)
Longest span84 ft (25.6 m)
Deck width94 ft (28.5 m)
Roadway width82 ft (25.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,250 (2014)
Projected traffic2,000 by 2034
Trucks0%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Starcrest DR NB over IH 410 Ml & EB Off Ramp built?

It was built in 2010, making it 15 years old in 2025.

What condition is Starcrest DR NB over IH 410 Ml & EB Off Ramp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2022.

How much traffic does Starcrest DR NB over IH 410 Ml & EB Off Ramp carry?

About 1,250 vehicles per day (2014 count).

How long is Starcrest DR NB over IH 410 Ml & EB Off Ramp?

The structure is 218 ft (66.4 m) long with a longest span of 84 ft (25.6 m) and a deck 94 ft wide.

Who owns Starcrest DR NB over IH 410 Ml & EB Off Ramp?

It is owned by the State Highway Agency.