US Bridges

IH 410 Wbfr over Perrin Beitel Creek

Fair

Bexar County, Texas · 0.05 MI E of FM 2252 · Structure no. 150150052104235

Built
1981
44 years old
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
320 ft
7 main spans
Daily traffic
14,386
2023 count
Owner
State
State Highway Agency

About this bridge

IH 410 Wbfr over Perrin Beitel Creek is a prestressed concrete stringer/multi-beam or girder carrying IH 410 Wbfr over Perrin Beitel Creek in Bexar County, Texas. It was built in 1981, so it is 44 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 14,386 vehicles a day, roughly 4% of them trucks, projected to reach 17,039 by 2038. The structure is 320 ft (97.5 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIH 410 Wbfr
CrossesPerrin Beitel Creek
Location0.05 MI E of FM 2252
RouteState Highway 410
StateTexas
Coordinates29.51634, -98.40886
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans7
Design loadHS 20
Structure length320 ft (97.5 m)
Longest span50 ft (15.2 m)
Deck width46 ft (14 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,386 (2023)
Projected traffic17,039 by 2038
Trucks4%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$33,000
NavigationNo navigation control on waterway

Frequently asked questions

When was IH 410 Wbfr over Perrin Beitel Creek built?

It was built in 1981, making it 44 years old in 2025.

What condition is IH 410 Wbfr over Perrin Beitel Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does IH 410 Wbfr over Perrin Beitel Creek carry?

About 14,386 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is IH 410 Wbfr over Perrin Beitel Creek?

The structure is 320 ft (97.5 m) long with a longest span of 50 ft (15.2 m) and a deck 46 ft wide.

Who owns IH 410 Wbfr over Perrin Beitel Creek?

It is owned by the State Highway Agency.