IH 410 Ebfr over Perrin Beitel Creek
FairBexar County, Texas · 0.05 MI E of FM 2252 · Structure no. 150150052104234
- Built
- 1981
- 44 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 323 ft
- 7 main spans
- Daily traffic
- 10,510
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
IH 410 Ebfr over Perrin Beitel Creek is a prestressed concrete stringer/multi-beam or girder carrying IH 410 Ebfr over Perrin Beitel Creek in Bexar County, Texas. It was built in 1981, so it is 44 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,510 vehicles a day, roughly 5% of them trucks, projected to reach 11,550 by 2038. The structure is 323 ft (98.5 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 410 Ebfr over Perrin Beitel Creek built?
It was built in 1981, making it 44 years old in 2025.
What condition is IH 410 Ebfr over Perrin Beitel Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does IH 410 Ebfr over Perrin Beitel Creek carry?
About 10,510 vehicles per day (2018 count), of which roughly 5% are trucks.
How long is IH 410 Ebfr over Perrin Beitel Creek?
The structure is 323 ft (98.5 m) long with a longest span of 50 ft (15.2 m) and a deck 46 ft wide.
Who owns IH 410 Ebfr over Perrin Beitel Creek?
It is owned by the State Highway Agency.