Wurzbach Pkwy EB over US 281 & Salado CR
GoodBexar County, Texas · 0.70 MI E of West Ave · Structure no. 150150025304253
- Built
- 2015
- 10 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,585 ft
- 1 main span
- Daily traffic
- 25,236
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Wurzbach Pkwy EB over US 281 & Salado CR is a prestressed concrete stringer/multi-beam or girder carrying Wurzbach Pkwy EB over US 281 & Salado CR in Bexar County, Texas. It was built in 2015, so it is 10 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 25,236 vehicles a day, roughly 5% of them trucks, projected to reach 35,330 by 2042. The structure is 1,585 ft (483.1 m) long and 49 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Wurzbach Pkwy EB over US 281 & Salado CR built?
It was built in 2015, making it 10 years old in 2025.
What condition is Wurzbach Pkwy EB over US 281 & Salado CR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Wurzbach Pkwy EB over US 281 & Salado CR carry?
About 25,236 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is Wurzbach Pkwy EB over US 281 & Salado CR?
The structure is 1,585 ft (483.1 m) long with a longest span of 156 ft (47.5 m) and a deck 49 ft wide.
Who owns Wurzbach Pkwy EB over US 281 & Salado CR?
It is owned by the State Highway Agency.