US 281 Nbfr over Salado Creek
GoodBexar County, Texas · 0.75 MI S of Bitters RD · Structure no. 150150025304059
- Built
- 1980
- 45 years old, rebuilt 1989
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 370 ft
- 6 main spans
- Daily traffic
- 17,230
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
US 281 Nbfr over Salado Creek is a prestressed concrete stringer/multi-beam or girder carrying US 281 Nbfr over Salado Creek in Bexar County, Texas. It was built in 1980 and reconstructed in 1989, so it is 45 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 17,230 vehicles a day, roughly 4% of them trucks, projected to reach 24,120 by 2033. The structure is 370 ft (112.8 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 281 Nbfr over Salado Creek built?
It was built in 1980, making it 45 years old in 2025. It was reconstructed in 1989.
What condition is US 281 Nbfr over Salado Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does US 281 Nbfr over Salado Creek carry?
About 17,230 vehicles per day (2013 count), of which roughly 4% are trucks.
How long is US 281 Nbfr over Salado Creek?
The structure is 370 ft (112.8 m) long with a longest span of 80 ft (24.4 m) and a deck 60 ft wide.
Who owns US 281 Nbfr over Salado Creek?
It is owned by the State Highway Agency.