IH 10 EB Ul Off Rp over N Trinity-Ih 10 on Ramp
FairBexar County, Texas · 0.20 MI N of SP 421 · Structure no. 150150007212208
- Built
- 1993
- 32 years old
- Condition
- Fair
- inspected July 2024
- Type
- Segmental Box Girder
- Prestressed Concrete Continuous
- Length
- 605 ft
- 6 main spans
- Daily traffic
- 50
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
IH 10 EB Ul Off Rp over N Trinity-Ih 10 on Ramp is a prestressed concrete continuous segmental box girder carrying IH 10 EB Ul Off Rp over N Trinity-Ih 10 on Ramp in Bexar County, Texas. It was built in 1993, so it is 32 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, roughly 4% of them trucks, projected to reach 70 by 2033. The structure is 605 ft (184.4 m) long and 26 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 10 EB Ul Off Rp over N Trinity-Ih 10 on Ramp built?
It was built in 1993, making it 32 years old in 2025.
What condition is IH 10 EB Ul Off Rp over N Trinity-Ih 10 on Ramp in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does IH 10 EB Ul Off Rp over N Trinity-Ih 10 on Ramp carry?
About 50 vehicles per day (2013 count), of which roughly 4% are trucks.
How long is IH 10 EB Ul Off Rp over N Trinity-Ih 10 on Ramp?
The structure is 605 ft (184.4 m) long with a longest span of 105 ft (32 m) and a deck 26 ft wide.
Who owns IH 10 EB Ul Off Rp over N Trinity-Ih 10 on Ramp?
It is owned by the State Highway Agency.