US Bridges

SH 35 over Salt Creek

Fair

Aransas County, Texas · 9.7 MI N of Pr 13 · Structure no. 160040018003072

Built
2006
19 years old
Condition
Fair
inspected February 2024
Type
Other
Prestressed Concrete
Length
800 ft
16 main spans
Daily traffic
4,177
2022 count
Owner
State
State Highway Agency

About this bridge

SH 35 over Salt Creek is a prestressed concrete other carrying SH 35 over Salt Creek in Aransas County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,177 vehicles a day, roughly 12% of them trucks, projected to reach 6,349 by 2042. The structure is 800 ft (243.8 m) long and 46 ft wide. If it were closed, the detour would be 93.2 mi (150 km).

CarriesSH 35
CrossesSalt Creek
Location9.7 MI N of Pr 13
RouteState Highway 35
StateTexas
Coordinates28.27233, -96.96096
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeOther
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans16
Design loadHS 20
Structure length800 ft (243.8 m)
Longest span50 ft (15.2 m)
Deck width46 ft (14 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,177 (2022)
Projected traffic6,349 by 2042
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed93.2 mi (150 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 35 over Salt Creek built?

It was built in 2006, making it 19 years old in 2025.

What condition is SH 35 over Salt Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does SH 35 over Salt Creek carry?

About 4,177 vehicles per day (2022 count), of which roughly 12% are trucks.

How long is SH 35 over Salt Creek?

The structure is 800 ft (243.8 m) long with a longest span of 50 ft (15.2 m) and a deck 46 ft wide.

Who owns SH 35 over Salt Creek?

It is owned by the State Highway Agency.