US Bridges

FAP 22 over SR-22 / N. Lindell St.

Fair

Weakley County, Tennessee · Near Martin · Structure no. 92SR0220046

Built
1987
38 years old
Condition
Fair
inspected August 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
130 ft
1 main span
Daily traffic
6,466
2021 count
Owner
State
State Highway Agency

About this bridge

FAP 22 over SR-22 / N. Lindell St. is a prestressed concrete box beam or girders - single or spread carrying FAP 22 over SR-22 / N. Lindell St. in Weakley County, Tennessee. It was built in 1987, so it is 38 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,466 vehicles a day, roughly 9% of them trucks, projected to reach 10,624 by 2040. The structure is 130 ft (39.6 m) long and 44 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesFAP 22
CrossesSR-22 / N. Lindell St.
LocationNear Martin
RouteState Highway 22
Coordinates36.37047, -88.85056
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.5 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 20
Structure length130 ft (39.6 m)
Longest span130 ft (39.6 m)
Deck width44 ft (13.4 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,466 (2021)
Projected traffic10,624 by 2040
Trucks9%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FAP 22 over SR-22 / N. Lindell St. built?

It was built in 1987, making it 38 years old in 2025.

What condition is FAP 22 over SR-22 / N. Lindell St. in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does FAP 22 over SR-22 / N. Lindell St. carry?

About 6,466 vehicles per day (2021 count), of which roughly 9% are trucks.

How long is FAP 22 over SR-22 / N. Lindell St.?

The structure is 130 ft (39.6 m) long with a longest span of 130 ft (39.6 m) and a deck 44 ft wide.

Who owns FAP 22 over SR-22 / N. Lindell St.?

It is owned by the State Highway Agency.