FAP 22 (new) Rp J over Icg Railroad
FairWeakley County, Tennessee · In Martin City Limits · Structure no. 92SR0220043
- Built
- 1987
- 38 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 184 ft
- 3 main spans
- Daily traffic
- 6,466
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 22 (new) Rp J over Icg Railroad is a prestressed concrete stringer/multi-beam or girder carrying FAP 22 (new) Rp J over Icg Railroad in Weakley County, Tennessee. It was built in 1987, so it is 38 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,466 vehicles a day, roughly 9% of them trucks, projected to reach 10,346 by 2042. The structure is 184 ft (56.1 m) long and 45 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 22 (new) Rp J over Icg Railroad built?
It was built in 1987, making it 38 years old in 2025.
What condition is FAP 22 (new) Rp J over Icg Railroad in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does FAP 22 (new) Rp J over Icg Railroad carry?
About 6,466 vehicles per day (2021 count), of which roughly 9% are trucks.
How long is FAP 22 (new) Rp J over Icg Railroad?
The structure is 184 ft (56.1 m) long with a longest span of 62 ft (18.9 m) and a deck 45 ft wide.
Who owns FAP 22 (new) Rp J over Icg Railroad?
It is owned by the State Highway Agency.