FAP 385 over Brunswick Rd.

Fair

Shelby County, Tennessee · Paul Barrett Pkwy. · Structure no. 79SR3850048

Built
1996
29 years old
Condition
Fair
inspected January 2023
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
183 ft
3 main spans
Daily traffic
7,924
2021 count
Owner
State
State Highway Agency

About this bridge

FAP 385 over Brunswick Rd. is a prestressed concrete continuous box beam or girders - single or spread carrying FAP 385 over Brunswick Rd. in Shelby County, Tennessee. It was built in 1996, so it is 29 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,924 vehicles a day, roughly 8% of them trucks, projected to reach 20,096 by 2041. The structure is 183 ft (55.9 m) long and 44 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesFAP 385
CrossesBrunswick Rd.
LocationPaul Barrett Pkwy.
RouteState Highway SR385
Coordinates35.31011, -89.76231
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating89.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length183 ft (55.9 m)
Longest span113 ft (34.4 m)
Deck width44 ft (13.4 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,924 (2021)
Projected traffic20,096 by 2041
Trucks8%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FAP 385 over Brunswick Rd. built?

It was built in 1996, making it 29 years old in 2025.

What condition is FAP 385 over Brunswick Rd. in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.

How much traffic does FAP 385 over Brunswick Rd. carry?

About 7,924 vehicles per day (2021 count), of which roughly 8% are trucks.

How long is FAP 385 over Brunswick Rd.?

The structure is 183 ft (55.9 m) long with a longest span of 113 ft (34.4 m) and a deck 44 ft wide.

Who owns FAP 385 over Brunswick Rd.?

It is owned by the State Highway Agency.