FAU 5131 over Branch
FairShelby County, Tennessee · Whitten RD - Memphis · Structure no. 79M28770001
- Built
- 1999
- 26 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 117 ft
- 1 main span
- Daily traffic
- 27,879
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
FAU 5131 over Branch is a prestressed concrete stringer/multi-beam or girder carrying FAU 5131 over Branch in Shelby County, Tennessee. It was built in 1999, so it is 26 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 27,879 vehicles a day, roughly 8% of them trucks, projected to reach 40,336 by 2041. The structure is 117 ft (35.7 m) long and 150 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 5131 over Branch built?
It was built in 1999, making it 26 years old in 2025.
What condition is FAU 5131 over Branch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does FAU 5131 over Branch carry?
About 27,879 vehicles per day (2021 count), of which roughly 8% are trucks.
How long is FAU 5131 over Branch?
The structure is 117 ft (35.7 m) long with a longest span of 117 ft (35.7 m) and a deck 150 ft wide.
Who owns FAU 5131 over Branch?
It is owned by the City or Municipal Highway Agency.