US Bridges

FAP 4 (ramp) over SR-4 Ramp / I-240

Fair

Shelby County, Tennessee · In Memphis · Structure no. 79I02400093

Built
1985
40 years old
Condition
Fair
inspected March 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
389 ft
4 main spans
Daily traffic
37,328
2021 count
Owner
State
State Highway Agency

About this bridge

FAP 4 (ramp) over SR-4 Ramp / I-240 is a steel continuous stringer/multi-beam or girder carrying FAP 4 (ramp) over SR-4 Ramp / I-240 in Shelby County, Tennessee. It was built in 1985, so it is 40 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 37,328 vehicles a day, roughly 9% of them trucks, projected to reach 49,442 by 2042. The structure is 389 ft (118.7 m) long and 32 ft wide. If it were closed, the detour would be 11.2 mi (18 km).

CarriesFAP 4 (ramp)
CrossesSR-4 Ramp / I-240
LocationIn Memphis
RouteU.S. Route 78
Coordinates35.08061, -89.95294
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating85.3 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, precast panels
Main spans4
Design loadHS 20
Structure length389 ft (118.7 m)
Longest span115 ft (34.9 m)
Deck width32 ft (9.8 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic37,328 (2021)
Projected traffic49,442 by 2042
Trucks9%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed11.2 mi (18 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FAP 4 (ramp) over SR-4 Ramp / I-240 built?

It was built in 1985, making it 40 years old in 2025.

What condition is FAP 4 (ramp) over SR-4 Ramp / I-240 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does FAP 4 (ramp) over SR-4 Ramp / I-240 carry?

About 37,328 vehicles per day (2021 count), of which roughly 9% are trucks.

How long is FAP 4 (ramp) over SR-4 Ramp / I-240?

The structure is 389 ft (118.7 m) long with a longest span of 115 ft (34.9 m) and a deck 32 ft wide.

Who owns FAP 4 (ramp) over SR-4 Ramp / I-240?

It is owned by the State Highway Agency.