US Bridges

FAU 5200 348588M over Pedestrian Walkway

Good

Shelby County, Tennessee · Holmes ST - Memphis · Structure no. 790B6370001

Built
2013
12 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
148 ft
3 main spans
Daily traffic
9,678
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

FAU 5200 348588M over Pedestrian Walkway is a prestressed concrete continuous stringer/multi-beam or girder carrying FAU 5200 348588M over Pedestrian Walkway in Shelby County, Tennessee. It was built in 2013, so it is 12 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,678 vehicles a day, roughly 4% of them trucks, projected to reach 13,136 by 2041. The structure is 148 ft (45.1 m) long and 65 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesFAU 5200 348588M
CrossesPedestrian Walkway
LocationHolmes ST - Memphis
RouteCity Street 5200
Coordinates35.13911, -89.95172
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67.5 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length148 ft (45.1 m)
Longest span60 ft (18.3 m)
Deck width65 ft (19.8 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,678 (2021)
Projected traffic13,136 by 2041
Trucks4%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesPedestrian / bicycle
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FAU 5200 348588M over Pedestrian Walkway built?

It was built in 2013, making it 12 years old in 2025.

What condition is FAU 5200 348588M over Pedestrian Walkway in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does FAU 5200 348588M over Pedestrian Walkway carry?

About 9,678 vehicles per day (2021 count), of which roughly 4% are trucks.

How long is FAU 5200 348588M over Pedestrian Walkway?

The structure is 148 ft (45.1 m) long with a longest span of 60 ft (18.3 m) and a deck 65 ft wide.

Who owns FAU 5200 348588M over Pedestrian Walkway?

It is owned by the City or Municipal Highway Agency.