US Bridges

FAU 5252 over Workhouse Creek

Fair

Shelby County, Tennessee · National ST - Memphis · Structure no. 790B6360001

Built
1950
75 years old
Condition
Fair
inspected March 2023
Type
Culvert
Concrete Continuous
Length
27 ft
2 main spans
Daily traffic
9,463
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

FAU 5252 over Workhouse Creek is a concrete continuous culvert carrying FAU 5252 over Workhouse Creek in Shelby County, Tennessee. It was built in 1950, so it is 75 years old, older than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 9,463 vehicles a day, roughly 4% of them trucks, projected to reach 13,120 by 2041. The structure is 27 ft (8.2 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFAU 5252
CrossesWorkhouse Creek
LocationNational ST - Memphis
RouteCity Street 5252
Coordinates35.16061, -89.94778
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating43.5 US tons
Inventory rating27.9 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHS 20
Structure length27 ft (8.2 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,463 (2021)
Projected traffic13,120 by 2041
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAU 5252 over Workhouse Creek built?

It was built in 1950, making it 75 years old in 2025.

What condition is FAU 5252 over Workhouse Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does FAU 5252 over Workhouse Creek carry?

About 9,463 vehicles per day (2021 count), of which roughly 4% are trucks.

How long is FAU 5252 over Workhouse Creek?

The structure is 27 ft (8.2 m) long with a longest span of 12 ft (3.7 m).

Who owns FAU 5252 over Workhouse Creek?

It is owned by the City or Municipal Highway Agency.