FAU 5208 over Abandoned Railroad
FairShelby County, Tennessee · Trigg Ave - Memphis · Structure no. 790B5810001
- Built
- 1982
- 43 years old
- Condition
- Fair
- inspected January 2025
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 114 ft
- 3 main spans
- Daily traffic
- 3,911
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
FAU 5208 over Abandoned Railroad is a prestressed concrete continuous box beam or girders - multiple carrying FAU 5208 over Abandoned Railroad in Shelby County, Tennessee. It was built in 1982, so it is 43 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,911 vehicles a day, roughly 3% of them trucks, projected to reach 6,258 by 2042. The structure is 114 ft (34.7 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 5208 over Abandoned Railroad built?
It was built in 1982, making it 43 years old in 2025.
What condition is FAU 5208 over Abandoned Railroad in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does FAU 5208 over Abandoned Railroad carry?
About 3,911 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is FAU 5208 over Abandoned Railroad?
The structure is 114 ft (34.7 m) long with a longest span of 39 ft (11.9 m) and a deck 44 ft wide.
Who owns FAU 5208 over Abandoned Railroad?
It is owned by the City or Municipal Highway Agency.