I65 over South Fork Red River
GoodRobertson County, Tennessee · .4 M N JCT SR25&I65 · Structure no. 74I00650021
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 175 ft
- 3 main spans
- Daily traffic
- 53,633
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I65 over South Fork Red River is a prestressed concrete continuous stringer/multi-beam or girder carrying I65 over South Fork Red River in Robertson County, Tennessee. It was built in 2023, so it is 2 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 53,633 vehicles a day, roughly 33% of them trucks, projected to reach 74,616 by 2041. The structure is 175 ft (53.4 m) long and 130 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I65 over South Fork Red River built?
It was built in 2023, making it 2 years old in 2025.
What condition is I65 over South Fork Red River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does I65 over South Fork Red River carry?
About 53,633 vehicles per day (2022 count), of which roughly 33% are trucks.
How long is I65 over South Fork Red River?
The structure is 175 ft (53.4 m) long with a longest span of 75 ft (23 m) and a deck 130 ft wide.
Who owns I65 over South Fork Red River?
It is owned by the State Highway Agency.