US Bridges

FAP 25 over I65

Good

Robertson County, Tennessee · JCT SR25&I65 · Structure no. 74I00650019

Built
2023
2 years old
Condition
Good
inspected March 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
170 ft
2 main spans
Daily traffic
6,575
2021 count
Owner
State
State Highway Agency

About this bridge

FAP 25 over I65 is a prestressed concrete continuous box beam or girders - multiple carrying FAP 25 over I65 in Robertson County, Tennessee. It was built in 2023, so it is 2 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,575 vehicles a day, roughly 7% of them trucks, projected to reach 10,304 by 2040. The structure is 170 ft (51.8 m) long and 57 ft wide.

CarriesFAP 25
CrossesI65
LocationJCT SR25&I65
RouteState Highway SR025
Coordinates36.52795, -86.64324
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length170 ft (51.8 m)
Longest span85 ft (25.9 m)
Deck width57 ft (17.5 m)
Roadway width55 ft (16.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,575 (2021)
Projected traffic10,304 by 2040
Trucks7%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FAP 25 over I65 built?

It was built in 2023, making it 2 years old in 2025.

What condition is FAP 25 over I65 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does FAP 25 over I65 carry?

About 6,575 vehicles per day (2021 count), of which roughly 7% are trucks.

How long is FAP 25 over I65?

The structure is 170 ft (51.8 m) long with a longest span of 85 ft (25.9 m) and a deck 57 ft wide.

Who owns FAP 25 over I65?

It is owned by the State Highway Agency.