US Bridges

I24 over I24 Rp / N Fork Ewing CR

Good

Davidson County, Tennessee · I24 Rp / N Fork Ewing · Structure no. 19I00240315

Built
1972
53 years old
Condition
Good
inspected September 2023
Type
Culvert
Concrete Continuous
Length
49 ft
3 main spans
Daily traffic
58,248
2021 count
Owner
State
State Highway Agency

About this bridge

I24 over I24 Rp / N Fork Ewing CR is a concrete continuous culvert carrying I24 over I24 Rp / N Fork Ewing CR in Davidson County, Tennessee. It was built in 1972, so it is 53 years old, older than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 58,248 vehicles a day, roughly 7% of them trucks, projected to reach 99,661 by 2042. The structure is 49 ft (14.9 m) long. If it were closed, the detour would be 9.9 mi (16 km).

CarriesI24
CrossesI24 Rp / N Fork Ewing CR
LocationI24 Rp / N Fork Ewing
RouteInterstate 24
Coordinates36.23914, -86.78516
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating98.2 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans3
Design loadHS 20
Structure length49 ft (14.9 m)
Longest span15 ft (4.6 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic58,248 (2021)
Projected traffic99,661 by 2042
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I24 over I24 Rp / N Fork Ewing CR built?

It was built in 1972, making it 53 years old in 2025.

What condition is I24 over I24 Rp / N Fork Ewing CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does I24 over I24 Rp / N Fork Ewing CR carry?

About 58,248 vehicles per day (2021 count), of which roughly 7% are trucks.

How long is I24 over I24 Rp / N Fork Ewing CR?

The structure is 49 ft (14.9 m) long with a longest span of 15 ft (4.6 m).

Who owns I24 over I24 Rp / N Fork Ewing CR?

It is owned by the State Highway Agency.