US Bridges

FAP 100 over LL-SR-100 / Church ST

Good

Chester County, Tennessee · SR100/CHURCH ST Henderson · Structure no. 12SR1000018

Built
2006
19 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
187 ft
3 main spans
Daily traffic
6,777
2021 count
Owner
State
State Highway Agency

About this bridge

FAP 100 over LL-SR-100 / Church ST is a prestressed concrete continuous stringer/multi-beam or girder carrying FAP 100 over LL-SR-100 / Church ST in Chester County, Tennessee. It was built in 2006, so it is 19 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,777 vehicles a day, roughly 4% of them trucks, projected to reach 10,410 by 2041. The structure is 187 ft (57.1 m) long and 53 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFAP 100
CrossesLL-SR-100 / Church ST
LocationSR100/CHURCH ST Henderson
RouteState Highway 100
Coordinates35.43163, -88.64114
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating89.3 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length187 ft (57.1 m)
Longest span93 ft (28.2 m)
Deck width53 ft (16.1 m)
Roadway width51 ft (15.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,777 (2021)
Projected traffic10,410 by 2041
Trucks4%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FAP 100 over LL-SR-100 / Church ST built?

It was built in 2006, making it 19 years old in 2025.

What condition is FAP 100 over LL-SR-100 / Church ST in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does FAP 100 over LL-SR-100 / Church ST carry?

About 6,777 vehicles per day (2021 count), of which roughly 4% are trucks.

How long is FAP 100 over LL-SR-100 / Church ST?

The structure is 187 ft (57.1 m) long with a longest span of 93 ft (28.2 m) and a deck 53 ft wide.

Who owns FAP 100 over LL-SR-100 / Church ST?

It is owned by the State Highway Agency.